Installation
Procedures

Interior Installation 
Please contact your local handyman
service for installation.
For
Do-It-Yourselfers.
Masonry Exteriors:
New
Construction:
Simply substitute
the HIDE-A-BRICK® for a standard building brick
beside each outdoor faucet as the wall is being laid.
Existing Construction:
- Pulverize an
existing brick with a 3/4" by 18" piece of galvanized pipe and a 2
pound hammer.* This should take about 10 minutes.
- Apply "mortar
repair" caulking to the HIDE-A-BRICK® with a
caulking gun and then insert into the opening.
Wood
Exteriors:
- Hold the HIDE-A-BRICK® against the wall and scribe the
outline with a pencil to form a box.
- Drill four
holes just inside the four corners of the "smaller" box.
- Use a jig saw
to complete the cut out.*
- Apply a liberal
amount of silicone caulk to the housing of the HIDE-A-BRICK® and then push into place.
*Always use adequate eye protection.